Caption | German SdKfz. 9 halftrack vehicle towing a Panzer VI Tiger I heavy tank in preparation for Operation Zitadelle, near Kursk, Russia, Jun 1943 ww2dbase | ||||||||
Photographer | Altvater | ||||||||
Source | ww2dbaseGerman Federal Archives | ||||||||
Identification Code | Bild 101I-022-2926-11A | ||||||||
More on... |
| ||||||||
Photo Size | 800 x 564 pixels | ||||||||
Photos on Same Day | 20 Jun 1943 | ||||||||
Added By | C. Peter Chen | ||||||||
Licensing | Creative Commons Attribution ShareAlike 3.0 Germany License (CC BY-SA 3.0 DE).
See Bild 101I-022-2926-11A on Wikimedia Commons According to the German Federal Archive (Bundesarchiv), as of 21 Jul 2010, photographs can be reproduced with if these preconditions are met: - add the signature of the pictures and - of name of the originator, i.e. the photographer. ... You also can use fotos from the Federal Archives for free on Wikimedia Commons http://commons.wikimedia.org/wiki/Commons:Bundesarchiv Please contact us regarding any inaccuracies with the above information. Thank you. |
Did you enjoy this photograph or find this photograph helpful? If so, please consider supporting us on Patreon. Even $1 per month will go a long way! Thank you. Share this photograph with your friends: Stay updated with WW2DB: |
Visitor Submitted Comments
2. Bill says:
22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.
22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.
3. Tony Smith says:
20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger
20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger
4. Anonymous says:
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
All visitor submitted comments are opinions of those making the submissions and do not reflect views of WW2DB.
Search WW2DB
News
- » Wreck of USS Edsall Found (14 Nov 2024)
- » Autumn 2024 Fundraiser (7 Nov 2024)
- » Nobel Peace Prize for the Atomic Bomb Survivors Organization (11 Oct 2024)
- » Wreck of USS Stewart/DD-224 Found (2 Oct 2024)
- » See all news
Current Site Statistics
- » 1,150 biographies
- » 337 events
- » 43,917 timeline entries
- » 1,241 ships
- » 350 aircraft models
- » 207 vehicle models
- » 375 weapon models
- » 123 historical documents
- » 260 facilities
- » 470 book reviews
- » 28,548 photos
- » 432 maps
Famous WW2 Quote
"No bastard ever won a war by dying for his country. You win the war by making the other poor dumb bastard die for his country!"George Patton, 31 May 1944
Support Us
Please consider supporting us on Patreon. Even $1 a month will go a long way. Thank you!
Or, please support us by purchasing some WW2DB merchandise at TeeSpring, Thank you!
18 Feb 2011 02:15:59 PM
CRIPPLED TIGER:
The two half-tracks towing Tiger 114 are the
Sd.Kfz.9s, known as (Famo) about 2500 were built. The German army used the vehicle for many different duties as a prime mover for the 24cm gun and the 8.8 flak 18.
It also doubled at times as a tank recovery vehicle, it had enough power to tow the Panzer Mk IV but, when needed to tow the Tiger, Panther or a King Tiger four Sd.Kfz were needed.
Tiger commanders were forbidden by regulation
to tow a crippled Tiger, the towing Tigers
engine would overheat, and led to breakdowns
you have the situation, where you lost two Tigers, but I'm sure crews didn't leave
a Tiger abandoned, and towed it under certain conditions.
THE BERGEPANZER-TIGER:
Three Bergepanzers were built in Sept. 1943
as Tiger Recovery Vehicles, equipped with
a derrick crane mounted in a center superstructure with rams, timber beams, towing chains, and other pioneer tools.
armed with one or two 7.92mm machine guns, but I'm sure crews carried what was needed and a lot of ammo to feed those machine guns.